← Guides from November 13, 2026

· For electrical contractors

How to write an electrical change order before the work

Stop eating the cost of extra work. Set up a one page change order you can send from the job site and get signed before you pull wire.

By Orion Jones, Westward

A change order is a short written note that says what extra work you will do, what it costs and that the customer agrees to it. The way to stop eating the cost of extra work is to write one before you start, from your phone, in about five minutes. A saved template, a small price list and an e-signature tool will do it.

Why extra work turns into free work

Extra work shows up in the middle of a job. The homeowner is standing in the kitchen and asks if you can add two outlets on that wall. You say sure. Nobody writes it down. Three weeks later the final bill is higher than the quote, and the customer is surprised and unhappy.

The customer is rarely the problem. Writing it up in the moment just feels slow, so it gets skipped. The goal is to make it so quick that you do it every time, even for small stuff.

Step 1: Build one template

Make a one page document in Google Docs or a Google Form. Keep these fields and nothing else:

  • Job name and address
  • Date
  • Description of the extra work in plain words
  • Reason: customer request, hidden condition or code requirement
  • Labor hours and your hourly rate
  • Materials and your markup
  • Total added cost
  • Effect on the schedule
  • Customer name and signature

The reason field matters. A hidden condition, like finding old knob and tube wiring behind a wall, is a different conversation from a customer who changed their mind. Writing the reason down protects you in both cases.

Be specific in the description. Write what, where and how many. Added two receptacles on the north kitchen wall, on the existing 20 amp circuit, wall already open. Do not write extra outlets. A vague line is how an argument starts at invoice time.

Step 2: Make a price list for common add-ons

Open a Google Sheet and list the extras you get asked for most. For example: added receptacle, added switch, recessed light, dedicated circuit, ceiling fan swap, EV charger circuit. Next to each one, put the hours and materials you normally need, then the price you charge.

Fill it in with your own numbers from past jobs. Do not copy anyone else's. The point is that pricing from the list is a lookup that takes a minute. Pricing from scratch means stopping, doing math in your head and often guessing low to avoid an awkward moment.

Step 3: Send it for approval on the spot

Use whatever your customers will actually answer. Options:

  • DocuSign, Dropbox Sign or PandaDoc, if you already pay for one of them
  • A PDF emailed from Gmail with a line that says reply with the word APPROVED
  • A signature on your phone screen while you are standing there

A reply by email may be enough for small items, but check what your contract says counts as written approval. If you are not sure, ask your attorney once and write the answer into your template.

Set a rule for yourself: no extra work starts until the order is sent. Sent, not signed, if the item is small. Signed, if it is over an amount you pick.

Step 4: Attach it to the job and the invoice

Save every signed order in the job folder in Dropbox or Google Drive, named with the job and the date. Add the amount to a running total on your job sheet. When you invoice in QuickBooks, add each change order as its own line, so the customer sees it matches what they signed.

Once a week, on Friday, look at your open change orders. Any that were sent but not answered get a nudge.

What to do yourself and what to pay for

Do yourself: the template, the price list and an e-signature account. That is a half day of work and costs little.

Worth paying for: the part where your crew never touches a document. Picture a foreman opening a simple form on a phone, picking items from your price list, snapping a photo and tapping send. The form builds the PDF, texts it to the customer, files it in the job folder, and adds the amount to the job total and the QuickBooks invoice. Done by hand, one change order gets typed into 3 places, and that is 3 chances for a typo or a missed charge. A small custom form removes the retyping.

If you write only a few change orders a month, skip the build. If you write several a week, it pays back fast, because every missed one is work you did and never billed.

Habits that make it stick

  • Tell the customer at kickoff that every change gets written up first. It sets the tone and nobody is surprised later.
  • Put the change order step on the foreman's checklist.
  • Count the change orders you write in the first month. Compare that with the extra work you remember doing. The gap is what you were giving away.

Where to go from here

If you want a form that builds the PDF and posts to QuickBooks for you, look at custom builds. Or talk it through with us and we will tell you honestly whether a simple template is enough for your shop.

Want this for your business?

A free 30-minute call. Just your email and the times that work.