How to get change orders signed without a trip back to the job
Set up a one page change order template and e-signature so homeowners approve extra work from their phone, and you get paid for it.
By Orion Jones, Westward
Put every change order on a one page form, send it from your phone with an e-signature tool like DocuSign, and do not start the extra work until it comes back signed. The homeowner signs in about a minute from the couch or the office. You stop absorbing the cost of 'while you're in there' work.
Why change orders get lost
Most change orders start as a sentence on site. The homeowner says move the outlet, add a niche, upgrade the tile. You say sure. Nobody writes it down until the final invoice, and then the homeowner is surprised by the number.
The paper step gets skipped because it costs you something. If the job is 20 minutes from your office, a trip back for one signature is about 40 minutes of driving round trip. Sending the form from your phone takes a couple of minutes. When signing is that easy, the excuse goes away.
Step 1: Build a one page template
Make one template in Google Docs or Word. Keep it to one page. Include:
- Job name and address
- Change order number (CO-1, CO-2 and so on)
- Date
- Plain description of the work, one or two sentences
- Price added or removed, as a single number
- Working days added to the schedule, even if it is zero
- New contract total
- A signature and date line for the homeowner, and one for you
The days line matters. Extra work often pushes the finish date, and a homeowner who agreed to the price did not necessarily agree to the delay. Writing 'adds 3 working days' ends that argument before it starts.
What a good description looks like
Vague descriptions cause fights. Compare these two.
- Weak: Extra electrical work in kitchen.
- Better: Add two outlets on the island wall and one under-cabinet light circuit, including drywall patch and paint touch-up.
The second one tells the homeowner exactly what they are paying for and tells your crew exactly what to build. Write it as if someone who was not on site has to understand it a year from now.
Step 2: Set it up for e-signature
In DocuSign, upload your template once and save it as a reusable template with the signature and date fields already placed. Next time you only fill in the blanks and type the homeowner's email. Adobe Acrobat Sign and similar tools work the same way. Check how many sends per month your plan includes before you commit, since limits vary.
Send it from your phone while you are still in the driveway and the conversation is fresh. Tell the homeowner an email is coming in a minute, they tap sign, and you start tomorrow. A request that lands while they are still thinking about it gets signed. One that lands three days later gets buried.
Step 3: Make the rule stick
Pick one rule and say it at the start of every job: no signed change order, no extra work. Put it in your original contract in one sentence. Tell your lead carpenter too, since they are the ones standing there when a homeowner asks for something.
When the request comes, the answer is friendly and simple: happy to do that, I'll send the change order right now. You are not saying no. You are saying yes in writing.
For tiny items, set a threshold. Anything under a number you choose gets a text confirmation that you screenshot and save. Anything over gets the form. Decide the number once so nobody has to guess.
Step 4: File it and bill it
When the signed copy comes back, save it to the job folder in Dropbox or Google Drive with a consistent name, such as Smith-Kitchen-CO-2-signed.pdf. Then add the amount to your next invoice in QuickBooks. Copy the number from the signed form instead of retyping it from memory. Every retype is one more chance for a typo.
Do a quick monthly check. Open each active job folder, count the signed change orders, and compare them to what you billed. If the numbers do not match, something got built for free.
What to do yourself and what to pay for
Do it yourself: the template, the DocuSign setup and the rule. That is an afternoon of work, and you will understand your own process better for having done it.
Worth paying for: connecting the pieces. If you want a signed change order to save itself to the right job folder, update the contract total in your job sheet and create a draft line in QuickBooks, that takes an integration. Zapier can handle some of it. A custom setup can handle all of it and match the way your company names jobs. It pays off when you run several jobs at once and the filing is eating your office manager's week.