← Guides from November 17, 2026

· For cabinet makers

How to Get Cabinet Change Orders Approved in Writing

Use a one page change order, a signature tool and one shop rule so no cabinet gets cut until the customer approves the change and the price.

By Orion Jones, Westward

Write every change on a one page change order, get it signed before you cut anything, and keep one rule in the shop: no signed change order, no new parts. That protects your margin and your relationship with the customer. Once you have a template, each change takes about 5 minutes.

Why changes cause fights

The customer stands in the half built kitchen and says, can we make that drawer stack wider? You say sure. Weeks later the final invoice is higher, and they remember a different conversation.

Changes in cabinet work cost real money. Sheet goods may already be cut, doors may be ordered, the finish may be sprayed. A verbal yes feels friendly in the moment, but it leaves you with no proof of what was agreed or what it cost.

Step 1: Make a one page template

Build it in Google Docs or Word and save it as a PDF. Include:

  • Job number, customer name and date
  • What is changing, written as before and after
  • Added or removed cost
  • Effect on the install date, even if it is none
  • Who asked for the change
  • Signature and date lines

Use plain language. If a homeowner cannot read it in a minute, it is too long.

Step 2: Know your prices for common changes

You will hear the same requests again and again: add a drawer, change a door style, add crown molding, move a sink base, add a pull out. Make a short list with your own prices for each, plus a drawing or redesign time rate. Redrawing a run is real work, so charge for it.

With a list, you can answer on the spot and send the change order that same day. Speed matters here. A change order that sits for 3 days is a change order the customer forgets.

Step 3: Send it for signature

Use DocuSign or the signing feature in Adobe Acrobat, so the customer can sign from a phone. An email reply that says I approve is better than nothing, but a signature on the actual form is stronger. Make sure the person who signed your original contract is the one signing the change. If a designer or contractor is involved, check your contract for who can approve changes.

This guide is not legal advice. Have a lawyer look at how your contract handles changes once, and update your wording if needed.

Step 4: Set the shop rule

Put it on the wall and tell your crew: the cut list only changes when a signed change order is in the job folder. If someone at the bench hears a change on site, they say, I will send you a change order, and they do not touch the saw until it is signed.

Save each signed PDF in the job folder with a clear name, like 2026-014 Smith CO1.

Step 5: Keep a running log

In a Google Sheet, track one row per change order:

  • Job number
  • Change order number
  • Date sent and date signed
  • Amount
  • Status (sent, signed, declined)

Add a running total per job. When you do the final invoice, it should equal the original contract plus all signed change orders. That check takes 2 minutes and prevents the argument at the end.

What to do yourself and what is worth paying for

Do the template, the price list, the signing tool and the shop rule yourself. None of it needs special software, and the rule is a habit, not a tool.

Paying someone makes sense when changes come from everywhere: texts, phone calls, emails and site visits. A setup can fill in the change order from your job sheet, send it for signature, remind the customer if they do not sign, and update the log and the folder on its own. An AI tool can also read an email thread or a text conversation and draft the change order for you to review. You still check every draft before it goes out, since a wrong price on a signed form is worse than no form.

If you do a handful of jobs a month, the manual version is fine. If your office person spends hours chasing signatures, that is the time to automate.

Next step

Change orders are one piece of the paper that piles up around every job. The guide on how to cut office paperwork shows the rest. If you want help setting it up for your shop, talk it through with us.

Want this for your business?

A free 30-minute call. Just your email and the times that work.